Contact Us

Let us quote your next project! Whether you have a spec or an idea, our team can assist in all phases of your project requirements.


Request a
Lunch 'n Earn
and Receive PDH's

Signup Online!



Case Studies

USACE LPE108
New Orleans, Louisiana

ACB Levee Armoring

Project Description:

This levee is located on Lake Pontchartrain, New Orleans East. Designers had two concerns: 1) Levee being breached by Lake Pontchartrain due to overtopping and scour 2) Needed a solution to provide Amtrak & Norfolk Southern an all-weather road to access their rail. The USACE also considered the protection of 380,000 people from the potential storm surge of Lake Pontchartrain.

Problem:

Prior to this project, the area experienced many years of threatening storm surge similar to Hurricane Katrina in 2005. The levee performance issues seen during Katrina prompted many governing agencies to begin rethinking the levee protection system surrounding New Orleans. Using this project as a model, many similar projects are being proposed and designed in a cumulative effort to enhance the New Orleans and Plaquemines Parish Hurricane Risk Reduction System.

Solution:

The Corps of Engineers selected a 9” open cell articulating concrete block along with a HPTRM erosion control mat for the landslide slope to armor six miles of levee and provide: flexibility, protection against storm surge from Lake Pontchartrain, revegetation growth and a driveable/all-weather road for Amtrak and Norfolk Southern rail system.

The New Orleans USACE District Office provided leadership and coordination with the US Coast Guard and the Southeast Louisiana Flood Protection Authority for a successful resolution



Download the USACE LPV 108 Case Study

View additional pictures in the photo gallery

Project Team Members:

Owner:
U.S. Army Corps of Engineers New Orleans, LA

Engineer:
U.S. Army Corps of Engineers New Orleans, LA

Job Number:
W912P8-15-D-0001 0002 USACE

Contractor:
BIS / Phylway Construction, LLC

Supplier:
Premier Concrete Products

Technical Description:
Product: Shoreblock® SD 900 OC
Square Feet: 754,200
Thickness: 9"
Installation Date: October 2015



One month after install


One month after install